Seismic Test
Q. (Lot 2 - FDU)
|
A. (Lotto 2) As reported in section 11.2 and 7.2.8 bullet point 4 (Whole Fast Discharge Unit), the seismic tests are mandatory they are type test and shall be performed on the entire FDU and hence on all components (I think separately on BPS/SCB and on DRs, but depends on total weight) during DDP we will decide if to apply this test only on mock-up (prototype) or only the first FDU. This can depend on if there is a different weights distribution between mock-up and first FDU. |