Q.

Does the installation of TFPS in the cold test facility also include the converter transformers? Its are not reported in fig.11. In case they are not included, how is the TFPS powered when tested in the FCCTF?

A. 

(Lotto 1) Converter transformers are included in the FCCTF installation of TFPS. You consider that the location of converter transformers is not yet confirmed, but they will be installed outside the FCCTF hall closest as possible using a small prefabricated. This means that you need consider length of cables connections of about 20m.   After a coordination meeting it was confirmed that they will be installed inside to the FCCTF (bottom left corner fig 11 Section 5.31 of TS) with a distance less than 7m.

 

 